How to compare home addition proposals in Brevard County
Addition proposals are harder to compare than remodels because they cover design, engineering, foundation, structure, roof and finishes, and each contractor may include different parts. This guide gives a method for lining them up. For the permit steps, see the home additions page.
Start with what each proposal includes
Put each proposal in a table with these rows. Blank cells are the finding.
- Survey, design and engineering, and who pays for them.
- Permit fees and the plan for inspections.
- Foundation, framing and roof.
- Electrical, plumbing and mechanical work.
- Windows, doors, insulation and drywall.
- Flooring, paint and trim.
- Disposal, cleanup and site protection.
Design and engineering
An addition needs plans from a Florida design professional and sometimes a structural engineer. Some builders include these in the price and some expect you to hire them separately. Ask who the professionals are, who owns the plans and what happens if the plans need to change.
Allowances
Allowances stand in for selections not yet made, such as flooring, windows or fixtures. A low allowance makes a proposal look cheaper and raises the final price when you choose. Ask each builder what allowance is used for each item and compare them with showroom prices.
Site conditions the price may not cover
Ask how each condition is handled if discovered after work begins, and how change orders are written.
- Soil conditions and foundation surprises.
- Existing wiring or plumbing that cannot support new work.
- Septic capacity.
- Flood-zone elevation requirements.
- Roof conditions at the tie-in.
Contracts and payment
Florida requires the contractor’s license number on proposals. Verify it on the state DBPR site. Ask for payments tied to stages such as foundation, framing, dry-in and inspections, and avoid paying ahead of completed work. Keep a copy of the contract, the permit and every change order.
Check the references
Ask each builder for the addresses of recent additions you can view, and for the permit numbers. A building office can confirm that a permit was closed. Talk to the owners about schedule, communication and how problems were handled.
Using the comparison
Once the table is done, ask each builder to explain the largest differences. Often a proposal changes when you ask it to include a missing item, showing that the first number covered less. Use the table to ask for the same assumptions from every bidder, not just the lowest total.
Questions to ask in writing
Ask each builder to confirm in writing who pulls the permit, who schedules inspections, how weather delays are handled, what warranty applies and how long it lasts. Ask also how the crew will protect the existing house and what hours they will work.
Timeline questions
Ask each builder to separate design, permit review, construction and inspections in the schedule, and to say who is responsible for each. Delays usually come from permit comments or material lead times, so ask how each is handled. Compare the timelines along with the scope, since a faster schedule that skips steps is not a better one.
Estimates for bigger projects
Whole-house work like your project is easier to compare when the proposal separates structure, finishes, trades, permits and allowances. How these estimates are built. Ask how allowances are handled, what happens when a selection costs more than the allowance, and how change orders are documented and approved. On larger projects the change-order process matters as much as the first number.
How a larger remodel is sequenced
- Define scope, budget range and must-haves before inviting proposals.
- Ask for drawings, a written scope and an allowance schedule from each contractor.
- Confirm permits, engineering and any association or flood-zone review.
- Agree on a payment schedule tied to stages and on how change orders work.
- Do a punch-list walkthrough, collect closeout documents and keep them together.
Checking the builder
A general contractor on this kind of project should hold an active state license you can find on the DBPR site and carry liability insurance and workers’ compensation or an exemption. Ask who prepares the drawings and engineering, and how the flood-zone and setback rules apply to your lot. Details are on the contractor check page. On a larger project, ask for a draw schedule tied to completed stages and for lien releases as payments are made. Keep a project folder with every contract, change order and permit.
Home remodeling questions
Why do addition proposals vary so much?
They often include different design, engineering, foundation or finish scope, and use different allowances. Compare each line, mark what is missing and ask each builder to price the same selections and the same assumptions. A proposal without a foundation line is a warning sign.
Who pays for the plans and engineering?
It depends on the builder. Some include them, others expect you to hire a design professional. Ask each bidder who is responsible, who owns the plans and what happens if the permit office requires changes. Ask who owns the drawings when the project ends.
What is a change order?
A written agreement to change the scope, price or schedule after the contract is signed. Require it in writing before extra work begins, with the cost and schedule effect listed, and keep copies with the contract. Ask how change orders will be priced.
How do I verify a builder’s license?
Search the license number or name on the state DBPR site and confirm it is active and appropriate. Florida requires the number on the proposal, and the permit should be in the contractor’s name. Ask also for the insurance certificate.
Projects this guide covers
Sources used on this page:Brevard County Residential Addition permits (BASS, plans, septic, flood information) (accessed Nov 2026); Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Florida Statutes 489.119 (contractor license number in proposals) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Last reviewed November 2026.