Home Additions in Brevard County
An addition changes the footprint or height of a house, so it follows a different path from a remodel: plans, a survey, structural review, flood and septic questions and a full permit. This page covers room additions and primary suite additions, and the steps to settle before you pay for drawings.
What the county permit expects
Brevard’s Residential Addition permit applies to any change that alters the footprint, adds height or converts non-living space to living space, and it covers the electrical, plumbing and roofing trades. Expect plans prepared by a Florida design professional, a plot plan with flood-zone information and, where there is a septic system, a Florida Department of Health approval document. Cities use their own checklists, so ask the office that covers your address.
Primary suite additions
A primary suite is the most common addition because it combines several rooms in one project. Ask the builder to show how the new space connects to the old and who engineers the tie-in.
- Bedroom, closet and bathroom layout, and how they connect to the house.
- Plumbing and electrical tie-ins and panel capacity.
- Roof tie-in and matching existing finishes.
- Septic capacity when a bedroom is added.
- How the addition affects heating and cooling.
Steps before you pay for drawings
- Order a current survey and ask the office for setbacks and lot coverage.
- Check the flood zone and ask how the 50 percent rule is counted.
- If the lot has a septic system, ask the health department what it requires.
- If you have an association, ask what exterior review involves.
- Ask each builder to review the site before design.
Flood zones and septic
In a FEMA flood zone, an improvement costing half or more of the building’s market value before the work counts as a substantial improvement and brings the whole building to current standards. A larger footprint or added bedroom can also affect septic capacity. These two issues can change design and cost, so settle them first.
Reading a builder’s proposal
A proposal for an addition should name the design professional, who prepares the survey and engineering, the trades, the permit plan, the schedule and the payment stages. Florida requires the contractor’s license number on the proposal, so verify it on the state DBPR site before you sign.
Estimates for bigger projects: home additions
Whole-house work like home additions is easier to compare when the proposal separates structure, finishes, trades, permits and allowances. How these estimates are built. Ask how allowances are handled, what happens when a selection costs more than the allowance, and how change orders are documented and approved. On larger projects the change-order process matters as much as the first number.
How a larger remodel is sequenced
- Define scope, budget range and must-haves before inviting proposals.
- Ask for drawings, a written scope and an allowance schedule from each contractor.
- Confirm permits, engineering and any association or flood-zone review.
- Agree on a payment schedule tied to stages and on how change orders work.
- Do a punch-list walkthrough, collect closeout documents and keep them together.
Checking the builder
A general contractor on home additions should hold an active state license you can find on the DBPR site and carry liability insurance and workers’ compensation or an exemption. Ask who prepares the drawings and engineering, and how the flood-zone and setback rules apply to your lot. Details are on the contractor check page. On a larger project, ask for a draw schedule tied to completed stages and for lien releases as payments are made. Keep a project folder with every contract, change order and permit.
Home remodeling questions
What permit does a home addition need in Brevard County?
Brevard’s Residential Addition permit, which covers footprint changes, added height and converting non-living space to living space, including electrical, plumbing and roofing. Expect plans from a Florida design professional, flood-zone information and, with a septic system, a health department approval document.
Who can pull the permit for an addition?
A licensed building, general or residential contractor, or a homeowner acting as their own builder under Florida’s owner-builder exemption, who applies in person. Ask a contractor for the license number, verify it on the state site and confirm who is responsible for inspections.
Does an addition need septic approval?
If the property has a septic system, the county asks for a health department approval document with the application. A larger footprint or an added bedroom can affect capacity, so check before the drawings are final. Ask your builder to contact the department.
Does a flood zone limit what I can add?
It can. In a mapped flood zone, an addition may be measured against half of the building's market value, a threshold that triggers current standards. Ask your floodplain office how it counts costs and whether earlier work on the same house is added in. Bring the builder's estimate.
Projects that often go with home additions
See how it plays out in: home remodeling in Titusville, home remodeling in Satellite Beach, home remodeling in Cocoa Beach. Start here:How to compare home addition proposals in Brevard County.
Sources used on this page:Brevard County Residential Addition permits (BASS, plans, septic, flood information) (accessed Nov 2026); Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); FEMA substantial improvement guidance (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Updated November 2026.