Whole-Home Remodeling in Brevard County

A whole-home remodel combines several trades and rooms into one project, so scheduling, permits and cost tracking matter as much as design. This page covers how to plan the phases, where the permits and flood rules come in and how to compare proposals.

Get My Free Estimate

Free estimate, no obligation. Takes about a minute.

Scope and phases

Ask the builder to show the sequence and which rooms will be usable at each stage.

  • Structural changes first, such as wall removal or openings.
  • Rough plumbing, electrical and mechanical, with inspections.
  • Insulation, drywall and windows or doors.
  • Flooring, cabinets, bathrooms and kitchen.
  • Paint, trim and final inspections.

Living in the house or moving out

Some households stay and some move out. Staying saves rent but adds dust and disruption, and some stages, such as flooring or water shutoff, are hard to live through. Ask the builder what each phase means for access, and plan for a temporary kitchen and bathroom.

Permits across trades

Florida requires a permit to alter or repair a building, with limited exemptions. A whole-home remodel will usually include several permits or a combined permit, covering structure, electrical, plumbing and mechanical work. Ask who is pulling each and how inspections are scheduled.

Flood zones and the 50 percent rule

In a FEMA flood zone, the total cost of improvements over a period may be compared to the building’s market value. A whole-home remodel can approach that level. Ask the floodplain office how it counts costs before you set the budget.

Keeping a long project on track

Ask for a written schedule, a weekly update and a change-order process that requires written approval before extra work begins. Keep a log of decisions and a folder of permits, inspections and receipts, which helps for insurance and resale.

Selections schedule

Ask for a list of selections with deadlines, such as flooring, windows and fixtures, so that orders are placed before they are needed.

Estimates for bigger projects: whole-home remodel

Whole-house work like whole-home remodel is easier to compare when the proposal separates structure, finishes, trades, permits and allowances. How these estimates are built. Ask how allowances are handled, what happens when a selection costs more than the allowance, and how change orders are documented and approved. On larger projects the change-order process matters as much as the first number.

How a larger remodel is sequenced

  1. Define scope, budget range and must-haves before inviting proposals.
  2. Ask for drawings, a written scope and an allowance schedule from each contractor.
  3. Confirm permits, engineering and any association or flood-zone review.
  4. Agree on a payment schedule tied to stages and on how change orders work.
  5. Do a punch-list walkthrough, collect closeout documents and keep them together.

Checking the builder

A general contractor on whole-home remodel should hold an active state license you can find on the DBPR site and carry liability insurance and workers’ compensation or an exemption. Ask who prepares the drawings and engineering, and how the flood-zone and setback rules apply to your lot. Details are on the contractor check page. On a larger project, ask for a draw schedule tied to completed stages and for lien releases as payments are made. Keep a project folder with every contract, change order and permit.

Home remodeling questions

Should I use one contractor for a whole-home remodel?

A single general contractor coordinates trades and permits but concentrates responsibility. Compare itemized proposals, check license numbers on the state site and ask how each trade is scheduled and supervised. Ask how you reach the general contractor when a trade fails to show.

Can I live in my house during a remodel?

Sometimes, depending on the phase. Dust, noise and water shutoffs make some stages hard to live through. Ask the builder what each phase means for access and plan temporary kitchen and bath arrangements. A short weekly meeting with the builder keeps surprises down.

Does the 50 percent rule apply to remodels?

In a FEMA flood zone, yes. Improvement costs may be compared to the building’s market value, and a whole-home remodel can approach half. Ask your floodplain office how it counts costs and whether phases are combined. Keep a running total of your own.

How do I compare whole-home proposals?

Put each in a table by room and trade. Check allowances, exclusions, payment stages, schedule and license numbers. Ask each builder to price the same selections so totals compare fairly. A spreadsheet with a line per room helps you spot items one bid left out.

Projects that often go with whole-home remodel

See how it plays out in: home remodeling in Titusville, home remodeling in Satellite Beach, home remodeling in Cocoa Beach. Start here:How to compare home addition proposals in Brevard County.

Sources used on this page:Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); FEMA substantial improvement guidance (accessed Nov 2026); Florida Statutes 489.119 (contractor license number in proposals) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.

Updated November 2026.