Second-Story Additions in Brevard County
A second story adds space without expanding the footprint, which helps on small lots, but it puts new load on the existing walls and foundation. This page covers the structural evaluation, the engineering and permit steps and the questions that separate a workable plan from an expensive surprise.
Can the house carry it?
The existing walls and foundation must be able to carry the added load, which usually requires a structural engineer’s evaluation and sealed plans. In a block house, the evaluation looks at reinforcement, tie beams and footings. Ask each bidder who prepares the engineering and whether the foundation was evaluated before a price was set.
What changes in a second-story project
- The roof is removed and rebuilt over the new level.
- A stair is added, which takes floor area below.
- Plumbing, electrical and mechanical systems extend upward.
- The household may need to move out during construction.
- Cooling for the new level is sized separately.
Permit and plans
Adding height triggers Brevard’s Residential Addition process or the city’s equivalent, with plans prepared by a design professional, a survey and, in flood zones, elevation information. Ask the office what it needs and how long review takes.
Living through the work
With the roof removed, the house is exposed to weather, so schedule matters, especially during hurricane season. Ask how the builder protects the house between roof removal and dry-in, and whether you should move out.
Questions to ask each bidder
Ask every bidder the same questions and keep the answers in writing, alongside the engineer’s report.
- Who evaluates the existing structure, and what is the finding?
- How is the house protected from weather during construction?
- Where will the stair go, and what does it take from the floor below?
- How will the new level be cooled?
Estimates for bigger projects: second-story additions
Whole-house work like second-story additions is easier to compare when the proposal separates structure, finishes, trades, permits and allowances. How these estimates are built. Ask how allowances are handled, what happens when a selection costs more than the allowance, and how change orders are documented and approved. On larger projects the change-order process matters as much as the first number.
How a larger remodel is sequenced
- Define scope, budget range and must-haves before inviting proposals.
- Ask for drawings, a written scope and an allowance schedule from each contractor.
- Confirm permits, engineering and any association or flood-zone review.
- Agree on a payment schedule tied to stages and on how change orders work.
- Do a punch-list walkthrough, collect closeout documents and keep them together.
Checking the builder
A general contractor on second-story additions should hold an active state license you can find on the DBPR site and carry liability insurance and workers’ compensation or an exemption. Ask who prepares the drawings and engineering, and how the flood-zone and setback rules apply to your lot. Details are on the contractor check page. On a larger project, ask for a draw schedule tied to completed stages and for lien releases as payments are made. Keep a project folder with every contract, change order and permit.
Home remodeling questions
Can I add a second story to a block home?
Sometimes. The existing walls and foundation must carry the added load, which usually requires a structural engineer’s evaluation and sealed plans, and the project needs a permit. Ask each bidder who prepares the engineering and whether the foundation was evaluated.
Do I need to move out during a second-story addition?
Often, at least for the roof and stair stages. The house is open to weather and the work is disruptive. Ask the builder how long, and how the house is protected between roof removal and dry-in. Ask whether temporary stairs exist.
Does a flood zone affect a second story?
Yes. A second story adds cost that counts toward the 50 percent test in a mapped flood zone, and the office will ask for elevation information. Ask the floodplain office how it totals costs for your project, and have your designer confirm the answer before you sign.
How is a second story permitted?
Through the Residential Addition process in the county, or the city’s equivalent, with plans and engineering from a design professional. Ask the office that covers your address what documents and inspections it requires. Ask who submits the sealed engineering with the plans.
Projects that often go with second-story additions
See how it plays out in: home remodeling in Titusville, home remodeling in Satellite Beach, home remodeling in Cocoa Beach. Start here:How to compare home addition proposals in Brevard County.
Sources used on this page:Brevard County Residential Addition permits (BASS, plans, septic, flood information) (accessed Nov 2026); Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); FEMA substantial improvement guidance (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Updated November 2026.
Talk through your remodel
Tell us what you want to change and an independent local contractor will follow up to arrange a free estimate.